Arizona has no construction heat standard yet, but ADOSH can still cite contractors for heat hazards, and Phoenix city contracts require a heat plan that flows down to subcontractors. On site, that means cool water, shade, rest breaks, acclimatization for new and returning workers, a heat emergency plan and supervisors trained to spot heat illness.
This page is part of ETC’s Arizona heat illness resources.
What the rules require today
ADOSH and the general duty clause
There is no Arizona construction heat standard in force, but ADOSH can cite heat hazards under the general duty clause (A.R.S. 23-403). The Governor’s task force recommendations were advanced by the ADOSH advisory committee in March 2026, and the Industrial Commission began reviewing rules in April 2026.
City of Phoenix contracts: heat plans for contractors and subcontractors
A City of Phoenix ordinance (adopted March 2024) requires city contractors with outdoor workers to have a heat safety plan, free cool water, shade and cooling, acclimatization and training, and the terms flow down to subcontractors.
The federal heat rule (proposed, pending)
A federal OSHA heat rule was proposed in August 2024 and remains pending.
Jobsite controls: water, shade, rest
Provide enough cool drinking water for frequent small amounts, shade or cooling areas within easy reach, and paid rest breaks that increase as the heat climbs.
Acclimatization for new and returning workers
New workers and those returning after time away are at the highest risk in their first days. Build a gradual schedule that increases heat exposure over about a week, with closer supervision.
Schedules: early starts and work-rest cycles
Shift heavy work to the cooler hours, start early, and set work-rest cycles tied to the heat index. Reorder tasks so the hardest work is not at the hottest time.
Heat emergencies on a jobsite
Train the crew to recognize heat illness and to act fast. For the signs and first aid, see heat exhaustion vs heat stroke.
Supervisor training and the buddy system
Supervisors should know the signs and the response, and crews should watch each other. On multi-employer sites, the general contractor coordinates heat measures across subs.
Put it in writing: the heat plan
Document it all in a written plan. Use the heat illness prevention plan template, or ask ETC for heat illness prevention consulting. For supervisor training, see OSHA 30-Hour Construction and semiconductor fab construction training.
FAQs
Is there an Arizona heat law for construction?
Not a specific standard yet. ADOSH can still cite heat hazards under the general duty clause, and rulemaking is in progress.
Does the Phoenix ordinance apply to subcontractors?
Yes. For city contracts with outdoor workers, the heat plan requirements flow down to subcontractors.
What should a jobsite heat plan include?
Water, shade and rest; an acclimatization schedule; heat-index triggers; emergency response; and supervisor and worker training.
How long should new workers acclimatize?
Plan for roughly a week of gradually increasing exposure, with the closest watch in the first days.
ETC trains construction crews and fab subcontractors across Arizona and writes heat plans.